Abstract
Timely assessment of the structural safety status of water diversion projects and taking necessary preventive measures are the primary conditions to ensure the safe operation of large-scale diversion structures. This paper proposes an integrated visualization framework based on the Building Information Model (BIM) to support the safety management of water diversion projects. The framework integrates data collection, data analysis, warning issuance, and emergency disposal into an integrated platform, which improves the automation level of safety management and the efficiency of emergency response. On this basis, a prototype system is developed and implemented in a water diversion project in Henan Province, China. The prototype of the system can automatically evaluate the structural safety status of water diversion structures, issue corresponding warnings to managers, and provide visual prompts to support decision-making. The system prototype and its demonstration verify the applicability and effectiveness of the framework.








Similar content being viewed by others
Data Availability
Not applicable.
References
Agarwal R, Garg PK (2016) Remote sensing and GIS based groundwater potential & recharge zones mapping using multi-criteria decision making technique. Water Resour Manag 30:243–260. https://doi.org/10.1007/s11269-015-1159-8
Amirebrahimi S, Rajabifard A, Mendis P, Ngo T (2016) A framework for a microscale flood damage assessment and visualization for a building using BIM-GIS integration. Int J Digit Earth 9:363–386. https://doi.org/10.1080/17538947.2015.1034201
Chen XS, Liu CC, Wu IC (2018) A BIM-based visualization and warning system for fire rescue. Adv Eng Inform 37:42-53.https://doi.org/10.1016/j.aei.2018.04.015
Chun X, Qu WL, Tan DM (2005) An application of data fusion technology in structural health monitoring and damage identification P Soc Photo-Opt Ins 5758:451–461 https://doi.org/10.1117/12.599783
Jia JS (2016) A technical review of hydro-project development in China. Engineering 2:302-312
Jiang YH, Li LB, Zhang Q, Lu ZC (2013) A study on wireless private network technology in an integrated automation system for safety monitoring of the South-to-North water diversion project. Sustain Develop Environ Ii, Pts 1 and 2 409–410:1638. https://doi.org/10.4028/www.scientific.net/AMM.409-410.1638
Kattel GR, Shang W, Wang Z, Langford J (2019) China’s South-to-North water diversion project empowers sustainable water resources system in the North. Sustain-Basel 11. https://doi.org/10.3390/su11133735
Kumar T, Gautam AK, Kumar T (2014) Appraising the accuracy of GIS-based Multi-criteria decision making technique for delineation of groundwater potential zones. Water Resour Manag 28:4449-4466.https://doi.org/10.1007/s11269-014-0663-6
Lau BPL, Marakkalage SH, Zhou YR, Ul Hassan N, Yuen C, Zhang M, Tan UX (2019) A survey of data fusion in smart city applications. Inform Fusion 52:357-374.https://doi.org/10.1016/j.inffus.2019.05.004
Li HY (2017) Evolutionary game analysis of emergency management of the middle route of South-to-North water diversion project. Water Resour Manag 31:2777-2789.https://doi.org/10.1007/s11269-017-1661-2
Liu D, Chen J, Hu D, Zhang Z (2019) Dynamic BIM-augmented UAV safety inspection for water diversion project. Comput Ind 108:163–177. https://doi.org/10.1016/j.compind.2019.03.004
Mignard C, Nicolle C (2014) Merging BIM and GIS using ontologies application to urban facility management in ACTIVe3D. Comp Industr 65:1276–1290. https://doi.org/10.1016/j.compind.2014.07.008
Peng SJ, Zhang ZT, Wu CL, Liu G (2018) Research on synchronization technology of geological data acquisition system based on NFC and mobile internet. J Circuit Syst Comp 27. https://doi.org/10.1142/S0218126618502250
Sun CS, Man QP, Wang YW (2015) Study on BIM-based construction project cost and schedule risk early warning. J Intell Fuzzy Syst 29:469–477. https://doi.org/10.3233/Ifs-141178
Wang H, Pan Y, Luo X (2019) Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis. Autom Constr 103:41–52. https://doi.org/10.1016/j.autcon.2019.03.005
Wei N, Xin XY (2019) Research evaluation on impact of mobile phone information technology on the urban public space development under the internet background. J Intell Fuzzy Syst 37:1753–1759. https://doi.org/10.3233/Jifs-179238
Wu IC, Lu S-R, Hsiung B-C (2015) A BIM-based monitoring system for urban deep excavation projects. Visual Eng 3. https://doi.org/10.1186/s40327-014-0015-x
Yi ML, Wang YY, Yan HH, Wan JF (2016) Data acquisition and analysis from equipment to mobile terminal in industrial internet of things. L N Inst Comp Sci So 173. https://doi.org/10.1007/978-3-319-44350-8_3
Zhang H, Shao LD, Liao WL, Li C, Weng KY (2017) Application of multi-sensor data fusion technique in greenhouse environmental monitoring 2017 International Conference on Smart Grid and Electrical Automation (Icsgea):51–55. https://doi.org/10.1109/Icsgea.2017.47
Zhao LL, Liu ZS, Mbachu J (2019) An integrated BIM-GIS method for planning of water distribution system. Isprs Int Geo-Inf 8: 331. https://doi.org/10.3390/ijgi8080331
Acknowledgments
This research was supported by the National Key Research and Development Program of China (No. 2018YFC0406905) and Innovative Research Groups of the National Natural Science Foundation of China (No. 51621092).
Author information
Authors and Affiliations
Contributions
SRZ conceived of the study. TL and CW designed the study, performed the research, and developed the system.TL wrote the initial draft of the paper. All authors contributed to the revisions.
Corresponding author
Ethics declarations
Competing Interests
The authors have no conflicts of interest to declare that are relevant to the content of this article.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Liu, T., Zhang, S. & Wang, C. A BIM-Based Safety Management Framework for Operation and Maintenance in Water Diversion Projects. Water Resour Manage 35, 1619–1635 (2021). https://doi.org/10.1007/s11269-021-02813-7
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-021-02813-7