Skip to main content
Log in

A gate reassignment framework for real time flight delays

  • Industry
  • Published:
4OR Aims and scope Submit manuscript

Abstract

Flight delays (such as early or late arrivals and late departures) are a frequent occurrence in actual day to day airport operations and it is often not possible to assign such flights to their original gates. Flight delay information may also vary with time. As a consequence, the airport authority needs to reassign flights to different gates in real-time. The traditional manual flight reassignment method is neither efficient nor effective in cases with variable flight delay information, and the reassignment is frequently time constrained. Consequently, in this study the goal is to develop a gate reassignment framework, and a systematic computerized tool, for repeatedly handling gate reassignments given varied flight delay information. The results of a test case related to Taiwan international airport operations, show that the proposed framework performs well.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Babic O, Teodorovic D, Tosic V (1984) Aircraft stand assignment to minimize walking. J Transp Eng 110: 55–66

    Article  Google Scholar 

  • Bihr RA (1990) A conceptual solution to the aircraft gate assignment problem using 0,1 linear programming. Comput Ind Eng 19: 280–284

    Article  Google Scholar 

  • Bolat A (1999) Assigning arriving flights at an airport to the available gates. J Oper Res Soc 50: 23–34

    Google Scholar 

  • Bolat A (2000) Procedures for providing robust gate assignments for arriving aircrafts. Eur J Oper Res 120: 63–80

    Article  Google Scholar 

  • Braaksma JP (1977) Reducing walking distance at existing airports. Airport Forum 135(145): 135–145

    Google Scholar 

  • Brazile R, Swigger K (1988) Expert gate scheduling. J IEEE Expert 3: 33–39

    Article  Google Scholar 

  • Brazile R, Swigger K (1991) Generalized heuristic for the gate assignment problem. J Control Comput 19: 27–32

    Google Scholar 

  • Cheng Y (1997) A knowledge-based airport gate assignment system integrated with mathematical programming. Comput Ind Eng 32: 837–852

    Article  Google Scholar 

  • Ding H, Lim A, Rodrigues B (2005) The over-constrained airport gate assignment problem. Compu Oper Res 32: 1867–1880

    Article  Google Scholar 

  • Dorndorf U, Drexl A, Nikulin Y, Pesch E (2007) Flight gate scheduling: state-of-the-art and recent developments. Omega, Int J Manag Sci 35: 326–334

    Article  Google Scholar 

  • Gosling GD (1990) Design of an expert system for aircraft gate assignment. Transp Res A 24: 59–69

    Article  Google Scholar 

  • Gu Y, Chung CA (1999) Genetic algorithm approach to aircraft gate reassignment problem. J Transp Eng 125: 384–389

    Article  Google Scholar 

  • Haghani A, Chen MC (1998) Optimizing gate assignments at airport terminals. Transp Res A 32: 437–454

    Google Scholar 

  • Hamzawi SG (1986) Management and planning of airport gate capacity: a microcomputer-based gate assignment simulation model. Transp Plann Technol 11: 189–202

    Article  Google Scholar 

  • ILOG CPLEX: (2006) User’s manual. ILOG, France

  • Jo G, Jung J, Zang C (1997) Expert system for scheduling in an airline gate allocation. Expert Syst Appl 13: 275–282

    Article  Google Scholar 

  • Mangoubi RS, Mathaisel DFX (1985) Optimizing gate assignment at airport terminals. Transp Sci 19: 173–188

    Article  Google Scholar 

  • Mulvey JM, Vanderbei RJ, Zenios SA (1995) Robust optimization of large-scale systems. Oper Res 43: 254–281

    Google Scholar 

  • Ruszczynski A, Shapiro A (2003) Stochastic programming. Elsevier, Amsterdam

    Google Scholar 

  • Srihari K, Muthukrishnan R (1991) An expert system methodology for aircraft-gate assignment. Comput Ind Eng 21: 101–105

    Article  Google Scholar 

  • Su YY, Srihari K (1993) A knowledge based aircraft-gate assignment advisor. Comput Ind Eng 25: 123–126

    Article  Google Scholar 

  • Vanderstraetan G, Bergeron M (1988) Automatic assignment of aircraft to gates at a terminal. Comput Ind Eng 14: 15–25

    Article  Google Scholar 

  • Yan S, Chang CM (1998) A network model for gate assignment. J Adv Transp 32: 176–189

    Article  Google Scholar 

  • Yan S, Shieh CW, Chen M (2002) A simulation framework for evaluating airport gate assignments. Transp Res A 36: 885–898

    Google Scholar 

  • Yan S, Huo CM (2001) Optimization of multiple objective gate assignments. Transp Res A 35: 413–432

    Google Scholar 

  • Yan S, Tang CH (2007) A heuristic approach for airport gate assignments for stochastic flight delays. Eur J Oper Res 180: 547–567

    Article  Google Scholar 

  • Zhang SX, Cesarone J, Miller FG (1994) A comparative study of an aircraft assignment problem at a large aircraft. Int J Ind Eng 1: 203–212

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Shangyao Yan.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Tang, CH., Yan, S. & Hou, YZ. A gate reassignment framework for real time flight delays. 4OR-Q J Oper Res 8, 299–318 (2010). https://doi.org/10.1007/s10288-009-0112-1

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10288-009-0112-1

Keywords

MSC classification (2000)

Navigation