Abstract
Higher quality and efficient production requires newer production methods and ideas. Newer methods contain newer problems that must be solved. As lean manufacturing was introduced to production environments, an important question occurred. What must be done to reduce the setup time? Shigeo Shingo tried to solve this problem by his methodology called SMED. In this text, an important success factor for setup times “sustainability” is taken into consideration. Here sustainability is used as keeping the success level achieved by using SMED at a desired point and not letting it to drop down. To achieve desired sustainability well-arranged standard procedures must be prepared. In this text an optimal changeover procedure is constituted with the aid of a predetermined time system (MTM-UAS) to standardize and preserve the improved changeover operations.
Similar content being viewed by others
References
Spann MS, Adams M, Rahman M, Czarnecki H, Schroer BJ (1999) Transferring lean manufacturing to small manufacturers: The role of NIST-MEP. University of Alabama in Huntsville
Shingo S (1985) A revolution in manufacturing, the SMED system. Productivity Press, University Park, IL
Eti MC, Ogaji SOT, Robert SD (2004) Implementing total productive maintenance in Nigerian manufacturing industries. Appl Energy 79:385–401
Chand G, Shirvani B (2000) Implementation of TPM in cellular manufacture. J Mater Process Technol 103:149–154
Sun H, Yam R, Wai-Keung NG (2003) The implementation and evaluation of total productive maintenance (TPM)—an action case study in a Hong Kong manufacturing company. Int J Adv Manuf Technol 22:224–228
Prado JC (2001) Beyond quality circles and improvement teams. Total Qual Manage 12(6):789–798
Bamber L, Dale BG (2000) Lean production: A study of application in a traditional manufacturing environment. ProdnPlan Control 11(3):291–298
McAdam R, McGeough F (2000) Implementing total productive maintenance in multi-union manufacturing organizations: Overcoming job demarcation. Total Qual Manage 11(2):187–197
Gilmore M, Smith DJ (1996) Set-up reduction in pharmaceutical manufacturing: an action research study. Int J Oper Prod Manage 16(3):4–17
Moxham C, Greatbanks R (2001) Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. Int J Qual Reliab Manage 18(4):404–414
McIntosh R, Culley S, Gest G, Mileham T, Owen G (1996) An assessment of the role of design in the improvement of changeover performance. Int J Oper Prod Manage 16(9):5–22
Van Goubergen D, Van Landeghem H (2002) Rules for integrating fast changeover capabilities into new equipment design. Robot Comput Integr Manuf 18:205–214
Mileham AR, Culley SJ, Owen GW, McIntosh RI (1999) Rapid changeover- a pre-requisite for responsive manufacture. Int J Prod Manage 19(8):785–796
Patel S, Shaw P, Dale BG (2001) Set-up time reduction and mistake proofing methods: A study of application in a small company. Bus Process Manage J 7(1):65–75
Niebel BW, Freivalds A (2003) Methods, standards, and work design. McGraw-Hill, New York
MTM-UAS (1995) Instructor manual. German MTM Association
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Cakmakci, M., Karasu, M.K. Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry. Int J Adv Manuf Technol 33, 334–344 (2007). https://doi.org/10.1007/s00170-006-0466-x
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-006-0466-x