Zusammenfassung
Bei der Durchführung von Projekten handelt es sich in den meisten Fällen um eine komplexe und äußerst vielseitige Aufgabe, bei der es nicht nur um die methodisch richtige Vorgehensweise, sondern auch um den Umgang mit Kunden, Vorgesetzten, Unterauftragnehmer, Lieferanten und Mitarbeitern geht.
Similar content being viewed by others
Author information
Authors and Affiliations
22.1 22.11 Appendices
22.11.1 Appendix I: Meeting Plan
A meeting schedule shall be included showing vertically at the x-axis the types of meetings such as:
-
Annual Top-Level Management Meetings
-
Quarterly Program Review Meetings
-
Monthly Progress Meetings
-
Engineering Meetings
-
Quality Meetings
-
Subcontractor/Supplier Coordination Meetings
Horizontally (y-axis) the exact date(s) of scheduled meetings shall be shown.
22.11.2 Appendix II: Narrative Progress Report
Contract N.: Narrative Progress Report
22.1 Activities Performed during the Period
In this paragraph you should provide a summary of the activities performed during the reporting period. Although you are free to adopt your own logical organization, please try to follow these guidelines:
-
Be concise
-
Avoid a report that is too structured (like reporting by Work Packages)
-
Do not keep reporting past issues adding new things to old ones, which are not anymore relevant for the time span covered in the report
-
Consider the MPR as a tool to keep the project team aware of the status of the project
-
Be systematic; provide the MPR on time, and not only during the first months. To summarize, the content of the:
-
I.
The Prime Contractor must keep track of all ongoing tasks of the project.
-
II.
Provision of the MPR is contractually due [date]. The MPR is an important tool to circulate project information within the team to motivate the team to remain keeps active the responsive.
-
I.
22.2 Deliverables Status List
This section is dedicated to provide an updated snapshot of the deliverable status. Deliverables cover all documents being produced and items being procured in the frame of the contract.
(1) Deliverable Status List: Documents
A summary table reporting the status of the document deliverable list das to be provided; see example below:
(2) Deliverable Status of HW and SW
Provide a summary table reporting any updates (if needed) of the deliverable items (Software and Hardware, developed or procured), following the example below:
22.3 (3) Problems Encountered and Proposed/Implemented Corrective Actions
Indicate any problem areas that you encountered and any corrective measures that will be taken.
22.4 (4) Planned Activities for Next Period and Outstanding Issues
Provide a short summary of the activities you plan to undertake for the next period and of any issue that needs to be resolved during project execution.
22.1 22.11.3 Appendix III: Schedule Progress
The following procedure applies to the project for progress reporting. The Template is to be used for the monthly communication of the progress status for the active Wok Packages. See steps to be taken:
-
1.
All due dates are derived from the master schedule.
-
2.
On a monthly basis the subcontractor will have to fill out the Actual Start Date and the Expected Completion Date.
-
3.
In case of a negative variance (delay) the subcontractor will have to estimate whether this delay has an impact on the work package completion date, and/or if so if this delay will impact other work packages.
-
4.
If there is an impact as defined in 4, this must be clearly identified. The impact on other events is to be mentioned.
-
5.
Steps for recovering the delay have to be identified by a recovery plan.
-
6.
It is the required to updated schedules on a monthly basis. Teleconferences are to be held on a biweekly basis or as appropriate.
22.1 22.11.4 Appendix IV: Cost Report
The following procedure applies to the project for cost reporting. The cost reporting allies at company and WP level by using the reported financial data from subcontractors and WP managers of the Prime Contractor. See explanation below:
-
1.
Subcontractors shall collect and document WP cost information of the project. These timesheets needs to be referenced to the appropriate Work Packages.
-
2.
On a monthly basis the summarized WP man-hours shall be prepared and submitted to the project PMO.
-
3.
The hourly rates for labor services have to be agreed with the financial department.
-
4.
Any procurement that is related to the project shall as well be marked in the corresponding field under the Work Package and month of procurement.
-
5.
It is imperative to keep all related documentation for procurements, special cost and work sheets. The Customer will perform audits for which the documentation is required.
-
6.
On a monthly basis the completed Cost Reporting Template shall be send to PMO of the Prime Contractor for review. The Prime Contractor will summarize the inputs on a monthly basis for review by the Customer.
-
7.
The summarized monthly spending will serve as reference for payment of milestones.
22.2 22.12 Acronyms and Abbreviations
- AI:
-
Action Item
- AIL:
-
Action Item List
- AIV:
-
Assembly, Integration and Verification
- AR:
-
Acceptance Review
- BPR:
-
Bi-weekly Progress Report
- CAC:
-
Cost at Completion
- CAS:
-
Cost Account Structure
- CCB:
-
Change Control Board
- CCN:
-
Contract Change Notice
- CDR:
-
Critical Design Review
- CDRL:
-
Contractual Data Requirements List
- CEO:
-
Company Executive Officer
- CI:
-
Configuration Item
- CIDL:
-
Configuration Item data List
- COF:
-
Contract Officer
- CTC:
-
Cost to Completion
- ECP:
-
Engineering Change Proposal
- FD:
-
Formal Document
- ICD:
-
Interface Control Document
- IMP:
-
Information Management Plan
- MCP:
-
Manpower and Cost Plan
- MIS:
-
Management Information System
- MOU:
-
Memorandum Of Understanding
- MPB:
-
Master Program Bar chart
- MPR:
-
Monthly Progress Report
- PCM:
-
Program Control Manager
- PDR:
-
Preliminary Design review
- PM:
-
Program Manager
- PMP:
-
Program Management Plan
- PMO:
-
Program Management Office
- PAB:
-
Program Advisory Board
- PSFT:
-
People Soft
- PT:
-
Product Tree
- QCM:
-
Quality Control Manager
- QPR:
-
Quarterly Progress Report
- QR:
-
Qualification Review
- RID:
-
Review Item Discrepancy
- RN:
-
Running Number
- ROF:
-
Regulatory Officer
- RSR:
-
Risk Status Report
- SCM:
-
Subcontractor Manager
- SOW:
-
Statement of Work
- SRR:
-
System Requirements Review
- TEM:
-
Technical Manager
- TS:
-
Technical Specification
- WA:
-
Work Authorization
- WBS:
-
Work Breakdown Structure
- WPD:
-
Work Package Description
Rights and permissions
Copyright information
© 2017 Springer-Verlag GmbH Deutschland
About this chapter
Cite this chapter
Madauss, BJ. (2017). Standardized Project Management Plan (PMP). In: Projektmanagement. Springer Vieweg, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-54432-7_22
Download citation
DOI: https://doi.org/10.1007/978-3-662-54432-7_22
Published:
Publisher Name: Springer Vieweg, Berlin, Heidelberg
Print ISBN: 978-3-662-54431-0
Online ISBN: 978-3-662-54432-7
eBook Packages: Computer Science and Engineering (German Language)