Summary
Product recovery gains increasing importance in spare parts acquisition, especially during the post product-life-cycle (PLC) service period. Considering product recovery in addition to traditional procurement options (final order, extra production) makes the underlying stochastic dynamic planning problem highly complex. An efficient heuristic for solving the integrated procurement problem is developed, which can be used to exploit the exibility offered by product recovery.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Hesselbach J, Mansour M, Graf R (2002) Reuse of components for the spare parts management in the automotive electronics industry after end-of-production. 9th CIRP International Seminar, Erlangen, Germany
Inderfurth K (1997) Simple optimal replenishment and disposal policies for a product recovery system with leadtimes. OR Spektrum 19:111–122
Inderfurth K, Kleber R (2008) Modellgestützte Flexibilitätsanalyse von Strategien zur Ersatzteilversorgung in der Nachserienphase. FEMM Working Paper No. 26/2008, Faculty of Economics and Management, Otto-von-Guericke University Magdeburg
Inderfurth K, Mukherjee K (2008) Decision support for spare parts acquisition in post product life cycle. Central European Journal of Operations Research 16:17–42
Kennedy WJ, Patterson JW, Fredendall LD (2002) An overview of recent literature on spare parts inventories. International Journal of Production Economics 76:201–215
Kiesmüller GP, Minner S (2003) Simple expressions for finding recovery system inventory control parameters. Journal of the Operational Research Society 54:83–88
Kleber R, Inderfurth K (2007) Heuristic approach for inventory control of spare parts after end-of-production. In Otto A, Obermaier R (eds) Logistikmanagement – Analyse, Bewertung und Gestaltung logistischer Systeme. DUV, Wiesbaden
Schröter M (2006) Strategisches Ersatzteilmanagement in Closed-Loop Supply Chains. DUV, Wiesbaden
Spengler T, Schröter M (2003) Strategic management of spare parts in closed-loop supply chains – a system dynamics approach. Interfaces 6:7–17
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Kleber, R., Inderfurth, K. (2009). A Heuristic Approach for Integrating Product Recovery into Post PLC Spare Parts Procurement. In: Fleischmann, B., Borgwardt, KH., Klein, R., Tuma, A. (eds) Operations Research Proceedings 2008., vol 2008. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-00142-0_34
Download citation
DOI: https://doi.org/10.1007/978-3-642-00142-0_34
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-00141-3
Online ISBN: 978-3-642-00142-0
eBook Packages: Mathematics and StatisticsMathematics and Statistics (R0)