Water in TBM drives, Delivery Tunnel South, Lesotho Highlands Water Project

  • Chapter
  • 236 Accesses

Abstract

This paper deals with a variety of related aspects concerning the dealing with groundwater in excavations driven by tunnel boring machine for the Delivery Tunnel South, a section of the waterway tunnel for the Lesotho Highlands Water Project. The paper commences with the design/tender predictions for water it was envisaged may be encountered, the tender methods specified for dealing with that water and the contractual aspects/sharing of risk/payment mechanisms set out in the tender documents for dealing with water. Following on details are provided of information tenderers submitted regarding their estimates of the time required to carry out cover drilling and grouting and the effect on overall TBM advance rates. The paper then concludes with details of actual water encountered, the manner in which the tender specifications were amended in dealing with that water, the actual effect on TBM production as well as the actual construction methods used.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Lesotho Highlands Water Project, (1989). Contract No. LHDA 126, Delivery Tunnel South, Tender Documents, Volumes 1 to 5.

    Google Scholar 

  2. Goodman, R., Moye, D., Schalkwyk, A. and Javandel, I (1965) “Ground water inflow during tunnel driving” Engng Geol. 2, 39–56.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 1994 Springer Science+Business Media Dordrecht

About this chapter

Cite this chapter

Featherstone, G.A. (1994). Water in TBM drives, Delivery Tunnel South, Lesotho Highlands Water Project. In: Tunnelling ’94. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-2646-9_22

Download citation

  • DOI: https://doi.org/10.1007/978-1-4615-2646-9_22

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4613-6136-7

  • Online ISBN: 978-1-4615-2646-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics